Network#

  • 1 Gbps Ethernet
  • 10 Gbps Ethernet
  • 100 Gpbs InfiniBand EDR

Storage#

  • BeeGFS parallel file system
    • 180 TiB of usable space
  • Initial quota Quota limits are applied to storage volumes
    • 50 GiB per user
    • 500 GiB per project

GPU nodes#

  • n[1-5]:
    • 2 x Intel Xeon E5-2620 v4 8 cores / 16 threads @ 2.40 GHz (Haswell)
    • 128 GiB of RAM
    • 2 x NVIDIA RTX A6000 with 48GiB of GDDR6 (PCIe)
  • n[51-55]:
    • 2 x Intel Xeon Gold 5120 14 cores / 28 threads @ 2.2GHz (Skylake)
    • 192 GiB of RAM
    • 3 x NVIDIA Tesla V100 with 32 GiB of RAM (PCIe)
  • n[101-102]:
    • 2 x Intel Xeon Gold 6148 20 cores / 40 threads @ 2.4 GHz (Skylake)
    • 384 GiB of RAM
    • 4 x NVIDIA Tesla V100 with 32 GiB of RAM (NVLink)